STATUS

spacer
spacer
spacer

Present (September 2008)

spacer
spacer
spacer

The work of assembling 34059 from the vast kit of parts continues.

spacer
spacer
J Fry
\
spacer
spacer
spacer

The boiler clothing and insulation is being attached to the boiler. Here the cladding around front of firebox is been adjusting.

spacer
spacer
J Fry
Boiler Dome
spacer
spacer
spacer

The smokebox liner plates being drilled and bolted into place. The aperture is for the middle cylinder steam pipe.

spacer
spacer
J Fry
Boiler Dome
spacer
spacer
spacer

The superheater header face to main steam pipe is being refaced.

spacer
spacer
J Fry
Front Tube Plate
spacer

spacer

 

The superheater header is about to be lifted into place and bolted to the front of the main steam pipe.

spacer
spacer
spacer
J Fry
Boiler Tubes
spacer
spacer
spacer

The superheater element production line is underway. The photograph shows the completed superheater elements awaitng pressure testing and then fitting into the large flue tubes and attachment to the superheater header

spacer
spacer
J Fry
Boiler Dome
spacer
spacer
spacer

The grate has been inserting into firebox.

spacer
spacer
J Fry
Boiler Dome
spacer
spacer
spacer

The backhead cladding painting is now complete and the fitting out of the backhead has commenced. The photograph shows the gauge glasses, most of the steam valves on the manifold, the blower fittings and the steam sanding control in place. A start will now be made on the backhead pipe runs.

spacer
spacer

June 2008 - update

spacer
spacer
spacer
J Fry
\
spacer
spacer
spacer

The smokebox has been attached to the boiler of No. 34059 and the combined item has been successfully, albeit temporarily, reunited with the frames.

spacer
spacer

June 2008

spacer
spacer
spacer

No. 34059 Sir Archibald Sinclair had a successful boiler insurance hydraulic examination ten days ago and a successful steam test in the presence of the boiler inspector on Wednesday 4th June. Pressure was set at 100psi with very few problems. A full pressure test will be undertaken when the boiler is in the frames.

spacer
spacer
J Fry
\
spacer
spacer
spacer

Roger Cruse firing at the start of the day after the boiler had been warmed through on Tuesday.

spacer
spacer
J Fry
Front Tube Plate
spacer

spacer

 

Tony Deller, the Bulleid Society technical adviser, keeps an eye on proceedings.

spacer
spacer
spacer
J Fry
Boiler Tubes
spacer
spacer
spacer

Observing the fire.

spacer
spacer
J Fry
Steam Valve
spacer

spacer

spacer

Initial smoke from the smokebox tubeplate in the absence of the smokebox and chimney

spacer
spacer
spacer
J Fry
Boiler Tubes
spacer
spacer
spacer

The boiler inspector observes proceedings.

spacer
spacer
J Fry
Boiler Dome
spacer
spacer
spacer

100 psi on the pressure gauge.

spacer
spacer
J Fry
Crinolines on Boiler
spacer
spacer
spacer

Steam via the safety valves, set at 100 psi.

spacer
spacer
spacer
spacer